Interest During Construction Calculator

During construction, you pay interest only on funds already drawn — not the full loan. This calculator shows stage-by-stage interest costs using the HIA standard drawdown schedule (12% / 17% / 25% / 23% / 23%).

Build Details

$500,000
6.50%

The 5-stage progress payment schedule

Australian construction loans are disbursed in stages tied to building milestones. The Housing Industry Association (HIA) standard schedule is used by most lenders:

Stage Milestone Draw %
1 — Slab/BaseFoundation complete12%
2 — FrameFrame erected, roof on17%
3 — Lock-UpWalls, windows, external doors25%
4 — FixingInternal fit-out, cabinets, tiling23%
5 — CompletionFinal inspection, handover23%

Some lenders use a deposit draw (5%) at contract signing. Where present, this draws before Stage 1. Individual builder contracts may vary from the HIA standard.

General advice only. Drawdown percentages are HIA standard — your builder's contract may differ. Interest rates shown are indicative. Verify with your lender.